What Are As-Built Drawings and When Do You Need Them? Toronto 2026 Guide

  • 416 Construction
  • Aug 5
  • 18 min read
416 Construction team reviewing as-built drawings for a completed Toronto renovation project
As-built drawings document how a construction project was actually completed, including any changes made to the original architectural, structural, mechanical or permit plans.

As-built drawings document how a building or construction project was actually completed, including changes made after the original architectural, engineering or permit drawings were issued.

They may show the final location, dimensions and configuration of:

  • Walls and rooms

  • Structural beams and columns

  • Foundations and footings

  • Doors and windows

  • Plumbing lines

  • Electrical systems

  • HVAC equipment and ductwork

  • Fire-safety systems

  • Underground services

  • Site grading

  • Building setbacks

  • Other concealed construction

As-built drawings are particularly valuable when the completed construction differs from the original design.

However, the term is frequently misunderstood.


An as-built drawing is not automatically the same as:

  • A permit drawing

  • A revised permit drawing

  • A record drawing

  • A measured drawing

  • An as-built survey

  • A shop drawing

  • An engineer’s field-review report

These documents serve different purposes and may be prepared by different professionals.


For a Toronto homeowner, the most important point is this:

As-built drawings can provide a valuable record of completed work, but they do not automatically legalize construction that differs from the approved permit.


When construction changes affect zoning, structure, fire safety, plumbing, HVAC, occupancy or other regulated matters, revised permit drawings may need to be submitted to Toronto Building and approved before the work can pass inspection.

This guide explains what as-built drawings are, what they should include, who prepares them and when they may be required for a Toronto construction project.


What Are As-Built Drawings?

As-built drawings are updated versions of the original construction documents that record significant changes made while the project was being built.


The Ontario Association of Architects and Ontario General Contractors Association describe as-built drawings as documents prepared by the contractor during construction to record the actual locations of building components and changes from the original contract documents. The contractor typically turns them over to the architect or client at project completion. (Ontario Association of Architects)

Construction rarely proceeds exactly as initially drawn.

Changes may occur because of:

  • Previously concealed conditions

  • Differences between old drawings and the existing building

  • Structural conditions discovered during demolition

  • Mechanical or plumbing conflicts

  • Material substitutions

  • Owner-requested revisions

  • Building-inspector comments

  • Engineering instructions

  • Site conditions

  • Coordination between trades

  • Unavailable products

  • Changes to equipment

  • Revised construction methods

For example, an approved basement-renovation drawing may show a plumbing stack in one location. After demolition, the contractor may discover that the actual stack is several feet away.


The finished plumbing layout may therefore differ from the original drawing.

The as-built documents should record that final location so future owners, designers and contractors know where the plumbing was installed.



Why Are As-Built Drawings Important?

Buildings contain many components that become difficult or impossible to see after construction is complete.


Once drywall, ceilings, flooring, concrete and landscaping have been installed, the exact location of concealed work may no longer be obvious.

Accurate as-built information can help future teams locate:

  • Underground plumbing

  • Drainage pipes

  • Electrical conduits

  • Shut-off valves

  • Cleanouts

  • Structural reinforcement

  • Steel beams

  • Mechanical equipment

  • Fire dampers

  • Sprinkler piping

  • Control wiring

  • Data cabling

  • In-floor heating lines

  • Foundation waterproofing

  • Below-grade services

Professional Engineers Ontario notes that the best time to collect information for as-built or record documents is during construction. Once the work has been covered or incorporated into an assembly, accurately verifying it can become difficult or impossible. (Professional Engineers Ontario)


This makes as-built documentation valuable for:

  • Building maintenance

  • Future renovations

  • Emergency repairs

  • Equipment replacement

  • Commercial leasing

  • Property management

  • Insurance claims

  • Construction dispute resolution

  • Building-permit revisions

  • Facility-management planning

  • Future additions

  • Sale or refinancing due diligence


As-Built Drawings vs. Record Drawings

The terms as-built drawings and record drawings are often used interchangeably, but Ontario industry guidance distinguishes between them.


As-built drawings

As-built drawings are generally prepared from information recorded by the contractor and trades during construction.

They may begin as a clean set of construction drawings that is marked up on site to show:

  • Changes from the original design

  • Actual equipment locations

  • Revised dimensions

  • Hidden services

  • Field instructions

  • Construction deviations

  • Relocated components


Record drawings

Record drawings are generally prepared by the architect, engineer or other design professional when that service is included in their contract.

They may combine:

  • Original design drawings

  • Addenda

  • Change orders

  • Site instructions

  • Known field changes

  • Contractor-provided as-built markups

  • Information observed during professional field reviews


The OAA and OGCA describe record drawings as drawings prepared by the architect, usually incorporating the original drawings, changes known to the architect and information from the contractor’s as-built documents. (Ontario Association of Architects)

Professional Engineers Ontario applies an important additional distinction. PEO explains that engineering record documents are based on information observed by the engineer or someone under the engineer’s supervision. By contrast, engineering as-built documents may incorporate information supplied by another party, such as contractor red-line markups. PEO states that as-built documents based on such information should not be sealed as verified engineering record documents. (Professional Engineers Ontario)


Why the terminology matters

The phrase printed on the drawing can affect what the user assumes about its accuracy.

A contractor’s as-built markup may show the best available information collected during construction. It does not necessarily mean that an architect or engineer independently measured and verified every concealed component.

A professionally prepared record drawing may involve a higher level of review, but its exact reliability still depends on:

  • The professional’s scope of services

  • The frequency of site reviews

  • Which components remained visible

  • Information supplied by the contractor

  • The required degree of accuracy

  • Limitations stated on the drawings

The required document and level of verification should therefore be defined in the construction contract before the project begins.


As-Built Drawings vs. Measured Drawings

Measured drawings document the existing condition of a building or space based on measurements taken during a site visit.

They are commonly prepared before a renovation when reliable original drawings are unavailable.

Measured drawings may show:

  • Existing room dimensions

  • Wall locations

  • Door and window locations

  • Ceiling heights

  • Stair dimensions

  • Plumbing-fixture locations

  • Structural elements that are visible

  • Existing exterior conditions

The OAA and OGCA distinguish measured drawings from as-built drawings. Measured drawings are prepared from on-site measurements of an existing building or space, while as-built drawings are developed during construction to track how a particular project was completed. (Ontario Association of Architects)


Example

A homeowner buys a 100-year-old Toronto house with no reliable drawings.

An architectural designer measures the property and prepares existing-condition floor plans.


Those are measured drawings.

The homeowner then completes a major renovation. During construction, the contractor records changes to the structural framing, plumbing and HVAC layout.


Those are as-built markups.

After construction, the architect updates the digital drawing set using known changes and contractor information.


Those may be delivered as record drawings, depending on the architect’s contract and the terminology being used.


As-Built Drawings vs. Revised Permit Drawings

This is the most important distinction for homeowners completing permitted construction.


As-built drawings record what was constructed

They document the final condition of the project.


Revised permit drawings request approval for a change

They are submitted to the municipality when regulated construction will differ from the drawings on which the building permit was issued.


A contractor should not construct an unapproved structural or life-safety change and assume that preparing an as-built drawing afterward will make the work acceptable.

Ontario’s building-permit guidance states that when completed work differs from the approved plans and permission for the revision was not obtained, the owner may be directed to correct the work. (Ontario)


Toronto Building accepts additional and revised drawings through its online File Submission Hub. Revised documents addressing examiner deficiencies must clearly identify the changes. (City of Toronto)


When Do Construction Changes Require Permit Revisions?

Not every minor field adjustment requires a formal permit revision.

However, the project team should consult the designer, engineer and building inspector before proceeding when a proposed change affects regulated construction.

Changes that may require revised permit drawings include:

  • Moving or removing a load-bearing wall

  • Changing a beam, column or footing

  • Changing foundation dimensions

  • Altering an underpinning sequence

  • Moving a basement entrance

  • Changing the building footprint

  • Increasing building height

  • Changing exterior setbacks

  • Relocating stairs

  • Changing stair dimensions or headroom

  • Changing guards or handrails

  • Enlarging exterior openings

  • Adding or removing windows

  • Changing fire separations

  • Relocating an exit

  • Changing the number of dwelling units

  • Changing a building’s use

  • Changing plumbing layouts

  • Adding bathrooms or kitchens

  • Changing HVAC systems

  • Relocating mechanical rooms

  • Changing insulation assemblies

  • Changing exterior cladding where spatial-separation requirements apply

  • Modifying sprinkler, fire-alarm or life-safety systems

Changes can affect several disciplines at once.


Moving a staircase, for example, may affect:

  • Floor framing

  • Structural beams

  • Headroom

  • Guards

  • egress

  • Fire separations

  • Plumbing

  • HVAC ductwork

  • The floor plan of more than one storey

A permit revision should therefore be reviewed as part of the complete building design—not as an isolated sketch.



Are As-Built Drawings Required for Every Toronto Renovation?

No.

Toronto does not universally require a complete set of as-built architectural, structural, mechanical and electrical drawings at the end of every residential renovation.

For a typical house renovation, the City’s focus is generally on:

  • Construction complying with the issued permit

  • Approved permit drawings being available on site

  • Required inspections being requested

  • Regulated components remaining visible until inspected

  • Approved revisions being obtained where necessary

  • Final inspections being completed


Toronto requires the permit information, approved drawings and specifications to be available on site for inspections. The City also warns that construction elements covered before inspection may have to be uncovered. (City of Toronto)

As-built drawings may nevertheless be required when:

  • The construction contract requires them

  • The owner requests them

  • The City or inspector requests specific documentation

  • The project involves residential infill surveying

  • An engineer requires verified information

  • Site-plan conditions require them

  • Municipal infrastructure is involved

  • A landlord or commercial tenant requires them

  • A condominium turnover requires record documentation

  • A lender, insurer or facility manager requires them

  • Construction differs materially from the approved drawings

  • The project involves complex mechanical or life-safety systems

The exact closeout requirements should be confirmed before construction begins.


When Do You Need As-Built Drawings?

1. When the Construction Contract Requires Them

As-built drawings are commonly listed as a project-closeout deliverable.

The contract or specifications may require the contractor to provide:

  • Marked-up architectural drawings

  • Structural changes

  • Mechanical as-built drawings

  • Electrical as-built drawings

  • Plumbing layouts

  • Underground-service plans

  • Equipment schedules

  • Control diagrams

  • Shop drawings

  • Testing and commissioning records

  • Operation and maintenance manuals

The required format should also be identified.

Possible formats include:

  • Marked-up paper drawings

  • Scanned PDF drawings

  • Clean digital PDFs

  • AutoCAD files

  • Revit or building-information-model files

  • Georeferenced survey files

Ontario industry guidance recommends establishing the required as-built and record-drawing format before tendering or contracting rather than waiting until project completion. (Ontario Association of Architects)


2. When the Completed Work Differs From the Original Design

Changes during construction should be documented, even when they do not require a formal municipal revision.

Examples include:

  • A plumbing cleanout moved to an accessible location

  • Ductwork rerouted around an existing beam

  • Electrical panels relocated within the approved room

  • Equipment models changed

  • Floor drains relocated

  • Shut-off valves moved

  • In-floor heating zones revised

  • Underground service routes adjusted

  • Non-load-bearing partitions shifted slightly

Recording these changes creates a more useful building file.

Where a change affects permit compliance, the required permit revision should be obtained rather than simply recording the change at the end.


3. When Constructing a New Infill House in Toronto

A construction as-built survey may be required for a new Toronto house.

This is different from a complete set of building as-built drawings.

Toronto’s residential infill guidance states that an as-built survey for a new building should show:

  • Required setbacks

  • The constructed building location

  • The first-floor elevation

The information allows the building inspector to verify matters such as setbacks and building-height reference elevations early enough for corrections to be made before construction advances too far. (City of Toronto)

An as-built survey is generally prepared by an Ontario Land Surveyor, not by the general contractor.

It may confirm:

  • Front-yard setback

  • Rear-yard setback

  • Side-yard setbacks

  • Foundation location

  • First-floor elevation

  • Below-grade garage elevation

  • Relationship to property boundaries

A survey verifying the foundation location does not replace architectural, structural or mechanical as-built drawings.


4. When Finalizing Site Grading for a New House

Toronto’s infill-housing grading process requires the owner to retain a qualified grading consultant to:

  • Prepare the site-grading plan

  • Conduct field review

  • Confirm compliance

  • Provide a final Lot Grading Certificate after the grades are completed

The final grading certification is a separate closeout document from the general contractor’s as-built drawings. (City of Toronto)

It may be necessary for confirming that the constructed grading:

  • Directs water appropriately

  • Does not create new ponding

  • Does not negatively affect neighbouring properties

  • Follows the approved grading plan


5. When Completing a Commercial Renovation

As-built drawings are particularly valuable for commercial projects because building systems are often more complicated than those in a house.

A commercial as-built package may include:

  • Architectural layouts

  • Reflected ceiling plans

  • Door schedules

  • Fire-separation layouts

  • Exit routes

  • Sprinkler systems

  • Fire alarms

  • Emergency lighting

  • Electrical panels

  • Data and communication systems

  • HVAC equipment

  • Plumbing

  • Equipment connections

  • Accessibility features

Commercial landlords may require this information before returning a construction deposit or approving project closeout.

The documents can also help future tenants understand what infrastructure is already available.


6. When Completing a Restaurant, Medical or Dental Office

Specialized commercial spaces contain systems that future owners and maintenance contractors may need to locate quickly.

For a restaurant, the as-built information may show:

  • Kitchen-exhaust ducts

  • Makeup-air equipment

  • Grease-interceptor locations

  • Gas lines

  • Floor drains

  • Fire-suppression systems

  • Refrigeration lines

  • Electrical circuits

  • Plumbing connections

For a medical or dental office, it may show:

  • Medical-gas piping

  • Vacuum lines

  • Compressed-air systems

  • Specialized electrical systems

  • Radiation-protection assemblies

  • Plumbing

  • Equipment locations

  • Data infrastructure

Without accurate documentation, future maintenance may require destructive investigation.


7. When Constructing a Duplex, Triplex or Multiplex

A Toronto rental conversion may involve:

  • Fire separations

  • Fire-rated doors

  • Smoke alarms

  • Carbon-monoxide alarms

  • Plumbing stacks

  • Separate electrical panels

  • HVAC systems

  • Fire stopping

  • Egress windows

  • Shared and private service areas

As-built documentation can help the owner maintain these systems and support future repairs.


However, as-built drawings should not be confused with municipal approval.

A multiplex conversion still requires the applicable permits, inspections and approved revisions. A drawing prepared after construction does not prove that concealed fire stopping, insulation or structural connections were installed correctly unless those conditions were properly observed and documented.


8. When Structural Framing Changes During Construction

Structural conditions frequently change after demolition reveals the building’s actual construction.

Possible discoveries include:

  • Joists running in an unexpected direction

  • Deteriorated framing

  • Missing lintels

  • Unusual foundation conditions

  • Concealed steel

  • Previous unpermitted modifications

  • Inadequate bearing

  • Undocumented posts

  • Different roof framing

The engineer may issue:

  • A site instruction

  • A sketch

  • A supplemental detail

  • A field-review report

  • Revised structural drawings

The final project file should incorporate the approved structural solution.

Where Toronto Building requests revised or as-built structural information, the drawings should be prepared and reviewed by the appropriate qualified professional.


9. When Installing Underground or Concealed Services

This is one of the strongest reasons to maintain as-built documentation.

The contractor should record components before they are covered, including:

  • Under-slab plumbing

  • Foundation drainage

  • Electrical conduits

  • Water-service lines

  • Sanitary lines

  • Storm lines

  • Sump-discharge piping

  • Irrigation lines

  • Gas services

  • In-floor heating

  • Waterproofing transitions

  • Reinforcing steel

  • Embedded plates

  • Sleeves through foundations

Useful documentation may include:

  • Dimensioned drawings

  • Measurements from fixed reference points

  • Photographs

  • Videos

  • Survey coordinates

  • Depths

  • Pipe sizes

  • Material specifications

  • Installation dates

A photograph showing a pipe is helpful. A photograph accompanied by dimensions and a clear drawing is much more useful.


10. When Planning a Future Renovation or Addition

Future designers can use reliable record information to make better preliminary decisions.

As-built or record drawings may help determine:

  • Where structural walls are located

  • Which areas contain plumbing

  • Where mechanical equipment is installed

  • Whether a proposed opening conflicts with a beam

  • How existing additions were constructed

  • Where underground services enter the building

  • Which walls contain fire separations

  • Whether a proposed addition conflicts with site services

The drawings do not eliminate the need for site verification.

Buildings change over time, and some information may never have been recorded. The designer should still confirm critical dimensions and visible conditions before relying on an older record set.


11. When Legalizing Previously Completed Construction

Homeowners sometimes request “as-built drawings” when they discover that previous renovations were completed without permits.

Technically, the first drawings required are often better described as:

  • Existing-condition drawings

  • Measured drawings

  • Permit drawings for existing construction

  • Legalization drawings

A designer measures the building and documents the work that currently exists.

The City may then require:

  • Architectural drawings

  • Structural engineering

  • HVAC information

  • Plumbing information

  • Energy-efficiency information

  • Investigation of concealed construction

  • Opening finished walls or ceilings

  • Professional reports

  • Corrective work

  • Required inspections

The drawings do not prove that concealed construction complies with the Building Code.

The City may require portions of the work to be uncovered so that the inspector or engineer can evaluate them.


12. When Closing an Old Building Permit

An open permit can become an issue during:

  • A property sale

  • Refinancing

  • Insurance underwriting

  • A future permit application

  • Property due diligence

Toronto states that the current registered property owner is responsible for outstanding building permits, including permits initiated by a previous owner. (City of Toronto)

Closing an old permit may require:

  • Reviewing the approved permit drawings

  • Comparing the drawings with existing conditions

  • Requesting inspections

  • Preparing revised or existing-condition drawings

  • Obtaining engineering review

  • Correcting deficient construction

  • Paying outstanding fees

  • Completing final inspection

As-built drawings may form part of this process, but the required solution depends on the permit’s history and the work that remains visible.


13. When the Owner Needs Better Facility-Management Records

Commercial, institutional and multi-residential owners should maintain an organized building record containing:

  • As-built and record drawings

  • Permit drawings

  • Engineer and architect reports

  • Equipment manuals

  • Warranty information

  • Testing reports

  • Commissioning documents

  • Inspection certificates

  • Fire-safety documentation

  • Service records

These documents reduce the time required to investigate future repairs and renovations.

They also help property managers transfer knowledge when staff, contractors or building operators change.



What Should As-Built Drawings Include?

The required content depends on the project.

Architectural As-Built Drawings

Architectural drawings may show:

  • Final room layouts

  • Wall locations

  • Doors and windows

  • Ceiling heights

  • Stairs

  • Guards and handrails

  • Millwork

  • Floor finishes

  • Reflected ceiling plans

  • Washroom layouts

  • Accessibility features

  • Fire separations

  • Building sections

  • Exterior elevations

Structural As-Built Information

Structural documents may show:

  • Foundations

  • Footings

  • Underpinning

  • Columns

  • Beams

  • Floor framing

  • Roof framing

  • Lintels

  • Connections

  • Reinforcement

  • Structural openings

  • Retaining walls

  • Shoring systems

Structural record documents require careful professional consideration because many elements become concealed.


PEO advises that the inspection scope, required accuracy and intended use should be defined with the owner. Record documents should be based on information observed by the practitioner or someone under the practitioner’s supervision. (Professional Engineers Ontario)


Mechanical As-Built Drawings

Mechanical drawings may show:

  • Furnaces

  • Boilers

  • Heat pumps

  • Air-conditioning equipment

  • Ductwork

  • Exhaust systems

  • Makeup-air units

  • Hydronic piping

  • Controls

  • Fire dampers

  • Equipment schedules

  • Access panels


Plumbing As-Built Drawings

Plumbing information may include:

  • Sanitary drainage

  • Storm drainage

  • Water lines

  • Plumbing stacks

  • Cleanouts

  • Floor drains

  • Backwater valves

  • Sump pumps

  • Sewage ejectors

  • Grease interceptors

  • Shut-off valves

  • Plumbing risers


Electrical As-Built Drawings

Electrical drawings may show:

  • Electrical panels

  • Circuits

  • Conduits

  • Transformers

  • Disconnects

  • Emergency lighting

  • Fire-alarm devices

  • Data systems

  • Security systems

  • Exterior lighting

  • Generator connections

  • Electric-vehicle chargers


Civil and Site As-Built Drawings

Site drawings may show:

  • Building location

  • Property setbacks

  • Finished grading

  • Catch basins

  • Manholes

  • Sanitary services

  • Storm services

  • Water services

  • Fire-hydrant connections

  • Driveways

  • Retaining walls

  • Landscaping infrastructure

  • Underground utility routes


Who Prepares As-Built Drawings?

The answer depends on the document being requested.

Document

Typical preparer

Contractor’s as-built markups

General contractor and subcontractors

Architectural record drawings

Architect or qualified designer, when contracted

Engineering record documents

Professional engineer with appropriate review and verification

Measured existing-condition drawings

Architect, BCIN designer or measurement professional

As-built property survey

Ontario Land Surveyor

Mechanical as-built drawings

Mechanical contractor or consultant

Electrical as-built drawings

Electrical contractor or consultant

Civil as-built drawings

Civil engineer and surveyor

Fire-protection as-built drawings

Fire-protection contractor or engineer

Responsibility should be assigned in writing.

A general requirement stating only “provide as-builts” can create disputes because it does not explain:

  • Which disciplines are included

  • Required accuracy

  • Who must verify the information

  • Whether professional drawings are required

  • Which file format must be supplied

  • Whether concealed work must be surveyed

  • Whether the documents must be suitable for future design

  • Whether a building-information model is required


How Are As-Built Drawings Prepared?

Step 1: Establish the Requirements Before Construction

The owner, contractor and consultants should agree on:

  • Required drawings

  • Required detail

  • Required accuracy

  • Responsible parties

  • File formats

  • Submission deadlines

  • Professional-review requirements

  • Photography requirements

  • Survey requirements


Step 2: Begin With the Issued Construction Drawings

A clean set of issued-for-construction drawings should be designated as the field as-built set.

This prevents workers from recording changes on several inconsistent versions.


Step 3: Record Changes as They Occur

The site team should record changes immediately rather than attempting to remember them at project completion.

Each change should identify:

  • Date

  • Location

  • Drawing reference

  • Revised dimension

  • Reason for the change

  • Related change order or site instruction

  • Responsible trade

  • Supporting photograph


Step 4: Document Concealed Conditions Before Covering Them

Measure and photograph:

  • Underground services

  • In-wall plumbing

  • Electrical conduits

  • Reinforcement

  • Structural connections

  • Fire stopping

  • Waterproofing

  • In-floor heating

  • Mechanical dampers

Toronto requires inspectors to be able to see the complete building element being inspected. Elements covered before passing inspection may need to be uncovered. (City of Toronto)


Step 5: Coordinate the Trade Drawings

The architectural, structural, mechanical, electrical and plumbing information should be compared for conflicts.

For example:

  • Ductwork should not pass through a structural beam unless an approved opening exists.

  • Plumbing stacks should match the architectural bathroom locations.

  • Fire dampers should correspond with rated separations.

  • Electrical panels should have the required working clearances.

  • Ceiling plans should coordinate with mechanical equipment.


Step 6: Transfer the Markups Into the Final Format

Depending on the contract, the final deliverable may be:

  • Scanned contractor markups

  • Updated PDF drawings

  • Revised CAD drawings

  • Record drawings prepared by the consultant

  • A coordinated digital model

The final file should identify its status clearly.


Step 7: Add Limitations and Source Information

The drawing should explain:

  • Who prepared it

  • What information was used

  • Whether concealed conditions were verified

  • Whether contractor information was relied upon

  • The intended use

  • The date of the recorded conditions

  • Any known limitations

This prevents future users from assuming a level of precision that the project team did not provide.


Common As-Built Drawing Mistakes

Waiting Until the End of Construction

Attempting to recreate six months of changes at project closeout usually produces incomplete information.

As-built documentation should be maintained throughout construction.


Recording Only Major Architectural Changes

Hidden plumbing, electrical and mechanical changes may be more valuable to the owner than minor visible layout adjustments.


Failing to Include Dimensions

A mark showing that a drain “moved” is not useful unless the revised location can be identified.

Use dimensions from fixed building elements.


Relying Only on Photographs

Photographs are valuable but may become difficult to interpret later.

Combine photographs with:

  • Drawing references

  • Dates

  • Locations

  • Dimensions

  • Written descriptions


Confusing As-Built Drawings With Approval

A drawing of completed unapproved work does not constitute municipal acceptance.

Regulated changes may still require:

  • Revised permit drawings

  • Engineering

  • Inspections

  • Corrective construction

  • City approval


Allowing Multiple Inconsistent Drawing Sets

One controlled drawing set should be maintained.

Every revision should include a date and clear description.


Covering Work Before It Is Recorded or Inspected

Once concrete or drywall is installed, verification becomes much more difficult.

Document and inspect concealed work at the appropriate stage.


Failing to Define the Required Accuracy

A schematic equipment location and a survey-grade underground-service location are not equivalent.

The intended future use determines the required precision.


Are As-Built Drawings Stamped or Sealed?

Not automatically.

The use of a professional seal depends on:

  • The profession involved

  • Who prepared the document

  • The information relied upon

  • The degree of field verification

  • The intended use

  • The professional’s regulatory obligations

PEO distinguishes contractor-supplied as-built information from engineering record

documents that have been reviewed and verified by a professional engineer. PEO states that as-built documents based on information gathered by others should not be sealed as though they were verified record documents. (Professional Engineers Ontario)


The presence of a seal should never be interpreted as a blanket guarantee that every concealed condition was independently verified.

The drawing notes and professional’s stated scope remain important.


Can As-Built Drawings Be Used for a New Building Permit?

They may provide useful background information, but they should not automatically be reused as permit drawings.

A new permit application normally requires drawings that:

  • Describe the proposed work

  • Meet current submission standards

  • Address the applicable Building Code

  • Include required designer information

  • Are signed and dated

  • Include professional seals where required

  • Coordinate with current zoning and applicable law

Toronto requires permit drawings to be fully dimensioned, drawn to scale, signed and dated, with the appropriate designer identification. (City of Toronto)

An old record drawing may need to be:

  • Field verified

  • Updated

  • Redrawn

  • Supplemented with structural information

  • Coordinated with a current survey

  • Revised for current conditions


How Much Do As-Built Drawings Cost in Toronto?

There is no standard price because the required service can range from basic contractor markups to a professionally coordinated set of architectural, structural and mechanical record documents.

Cost factors include:

  • Building size

  • Number of floors

  • Complexity

  • Number of disciplines

  • Availability of original drawings

  • Quality of field markups

  • Amount of site measurement required

  • Whether concealed systems were documented

  • Required accuracy

  • CAD or Revit requirements

  • Engineering involvement

  • Surveying

  • Number of revisions

  • Whether the building must be investigated after completion

Preparing the drawings during construction is generally more efficient than attempting to reconstruct the information after all components have been concealed.

The scope and fee should be established before construction begins.



Frequently Asked Questions


What is the meaning of as-built drawings?

As-built drawings document the final constructed condition of a project, including known changes from the original construction documents.


Are as-built drawings the same as permit drawings?

No. Permit drawings show the construction approved by the municipality. As-built drawings record how the project was actually completed.


Do as-built drawings legalize unpermitted work?

No. Existing work may still require a permit, professional review, inspections and corrective construction.


Are as-built drawings required for every Toronto house renovation?

No. They are not a universal closeout requirement for every residential renovation. They may be required by the contract, owner, inspector or specific project conditions.


What is an as-built survey?

An as-built survey is prepared by an Ontario Land Surveyor to confirm constructed site information such as building location, setbacks and elevations. It is different from a full set of architectural and engineering as-built drawings.


Does Toronto require an as-built survey for a new house?

Toronto’s residential infill guidance requires as-built survey information early in new-house construction to verify matters such as setbacks and first-floor elevation. (City of Toronto)


Who is responsible for preparing as-built drawings?

The contractor typically maintains field as-built markups. Architects, engineers, surveyors and other consultants may prepare separate record documents when included in their contracts.


Should the contractor record concealed services?

Yes. Concealed components are among the most valuable items to document because they become difficult to locate after construction.


What are red-line drawings?

Red-line drawings are field copies marked to identify changes from the issued construction documents. They are frequently used as the source for final as-built or record drawings.


Are shop drawings the same as as-built drawings?

No. Shop drawings explain how a specific product, system or assembly is proposed to be fabricated or installed. As-built drawings record the final installation.


Do I need as-built drawings to sell my house?

They are not a universal requirement for every Toronto property sale, but they may assist with due diligence, open permits, renovations, lender questions or buyer concerns.


Can as-built drawings close an open permit?

They may be part of the solution, but the City may also require inspections, revised permit drawings, engineering reports or corrective work.


What happens if the construction does not match the approved permit drawings?

The inspector may request approved revisions or require the work to be corrected. The issue should be addressed before the work is concealed or the permit reaches final inspection. (Ontario)


Should as-built drawings be included in a construction contract?

For custom homes, additions, commercial renovations and complex projects, the required closeout documentation should be clearly defined in the contract.


Maintain Accurate Construction Records With One Design-Build Team

As-built documentation is most effective when it is treated as part of the construction process—not as paperwork completed after everyone has left the site.

Architectural design, engineering, permitting and construction changes should remain coordinated from the beginning of the project through final inspection.

416 Construction provides integrated design-build services throughout Toronto and the Greater Toronto Area, including:

  • Existing-condition measurements

  • Architectural drawings

  • Structural engineering

  • Mechanical and HVAC design

  • Building-permit applications

  • Permit revisions

  • Responses to City comments

  • Contractor as-built documentation

  • Record-drawing coordination

  • Residential infill construction

  • Commercial renovations

  • Multiplex conversions

  • Final inspection and permit-closeout coordination

Whether you are planning a custom home, major renovation, rental conversion or commercial fit-out, maintaining an accurate construction record can prevent expensive investigation and uncertainty in the future.